MKDONSRUS.COM |
|
|
The "open day" for season ticket holders is
fast approaching (19th November) so here's the last set of pictures, Captions are below each picture
A panoramic view, from the South East corner
The stairway is complete The first set of turnstiles are installed.
The main entrance is having it's final framework installed. The main player corridor, under the West Stand.
Those nice shiny black bricks are finally starting to show The service ramp. The pitch is in the distance, the event arena to the left.
The stadium will also have police cells. Pre cast steps, to be installed by the side of the event arena.
Lift equipment is about too be installed.
Inside the new event arena. This is looking to the far the end. |