Time for another trip inside the stadium to see the latest progress (Thanks to Buckingham)

The work of creating a pitch is not often seen, so today, I'm going to concentrate on some of the finer points
You may never get the chance to see this again.

First, the pitch is levelled, using a laser fitted to a tripod.  Channels are dug across the width of the pitch (pic 1)
This is then covered by  a membrane, and perforated pipe is place in the channel.  This in turn is then covered in fine
 gravel (pic2)  You can just see the remains of the white pipe.  Pic 3 shows the channels across the pitch, before being
covered.

Picture 4 shows the whole picture (if you pardon the pun)  The laser tripod is to the left of the picture. 
The small digger on the far side of the pitch, is digging the trench to take the main pipe soak away.  You can also see the
coils of white pipe, on the nearside of the pitch, by the red tractor.

The next picture, shows how the floor surface is got so smooth.  The machine has very large "paddles" which rotate,
smoothing, as they go.  Last, a workman drilling a very large hole, through concrete.  It must be nearly 2ft across.

Next, wiring the site is also coming along.  2 pictures, different rooms.  I guess they speak for themselves.  Note the 2nd
picture, the large black pipe, to the right of the wiring, is one of the pipes that take the rainwater from the roof.

Back to the pitch, looking slightly forward, the pumps that will run the pitch irrigation system
have been delivered.  Last picture, shows some of the incredible pipe work that is being fitted under the main West Stand