MKDONSRUS.COM

 

 

 

 

A quick inside glimpse of the pitch progress today.  (Thanks to a friendly source)

The lines to the right, are "channels" being cut for the drainage.  Point to note, the terracing on the South side is nearing completion, as workmen finish "filling in the gaps".  Similar work is required in the South East corner.  (see 2nd picture)
This work should be completed later this week.  The contractors responsible for the steelwork (Rowcord), and PDF for laying the preformed concrete terracing, left site last Friday.