Today's pictures are a bit of a mixture.  The first 2 pictures are from a friend (Neil Ward), thanks Neil.  Neil was lucky enough to have a visit last week.  As you can see, the pitch area has now been entirely cleared of work, other than than the pitch.  (compare this to the picture taken on the 12th July.  Quite a difference !  All drainage channels have been completed, pipe work in place, and nearly covered by the fine gravel.

The first pictures shows the North Stand end, the second, the South stand.

  The next set of pictures, were taken today.  Most important, a pile driver has arrived on site, to start the piles for
the "Event Arena".  The Arena is expected to be completed some time early next year.
Work has also started on insulating the "Ballroom" roof.  (note the hoist, in the centre of the picture)  Also of note,
the pile driver, to the far right of the picture, just to the left of ASDA.