|
MKDONSRUS.COM |
|
|
My apologies for not posting sooner this month, but I've been very busy. Anyway, to make up for lost time, Buckingham have very kindly allowed another on site visit, and boy, are there some changes !! None more so than on the pitch itself !! As usual, with so many pictures, explanations are below each picture.
If you this what you are seeing is grass on
the pitch, I'm afraid you are mistaken. What you are seeing is plastic
grass, being
For full details of how this is done, checkout their website :- Grassmaster
Inside the "Ballroom". The plastic
sheeting has been installed, Glass has been fitted in
the command and control room,
The main entrance to the hotel, (West Stand) Below ground level, one of the utility rooms.
Looking out towards ASDA and IKEA. To the left, you can clearly see the outline for the new "Event Arena", while to the right, a large area has been tarmaced this week
Another panorama view, taken from the upper tier South West corner
The players tunnel, with door lintel going in place. Inside the hotel front lobby, a very wide sweeping staircase.
A closer view of one of the "Grass stitching machines"
Finally, a new site is being cleared, and prepared. Not sure what for yet, but as always, will keep you posted. Note, the main site entrance, top right hand corner. |